{"id":61,"date":"2021-01-15T23:53:02","date_gmt":"2021-01-15T23:53:02","guid":{"rendered":"http:\/\/dmresource.co.uk\/?page_id=61"},"modified":"2021-01-27T00:11:46","modified_gmt":"2021-01-27T00:11:46","slug":"what-is-development","status":"publish","type":"page","link":"https:\/\/dmresource.co.uk\/?page_id=61","title":{"rendered":"What is development?"},"content":{"rendered":"\n<div class=\"wp-block-image\"><figure class=\"alignright size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"225\" src=\"http:\/\/dmresource.co.uk\/wp-content\/uploads\/2021\/01\/planning-permission-approval-rates-300x225-1.jpg\" alt=\"\" class=\"wp-image-57\"\/><\/figure><\/div>\n\n\n\n<p>Development includes most building and engineering works, various operations, and material changes in the use of buildings or land. This means most improvements or extensions to a property are development \u2013 even the construction of a garden shed or the installation of CCTV for instances. Many changes of use are also development. A planning application to the Local Planning Authority (LPA) is often needed.<\/p>\n\n\n\n<p>However, an application to the LPA is not necessarily required if legislation already grants permission for the development concerned. This is known as \u2018<a href=\"https:\/\/www.southderbyshire.gov.uk\/our-services\/planning-and-building-control\/planning\/check-if-planning-permission-is-needed\">permitted development<\/a>\u2019.<\/p>\n\n\n\n<p>Most interior works to a building are not classed as development, although you may require other forms of consent (such as listed building consent or <a href=\"https:\/\/www.southderbyshire.gov.uk\/our-services\/planning-and-building-control\/building-control\">building regulations approval<\/a>).<\/p>\n\n\n\n<p>The display of advertisements is also controlled by planning legislation, although Deemed Consent provisions allow for many to bypass the requirement for an application.<\/p>\n\n\n\n<p>Works to protected trees and hedgerows also requires the consent of the LPA.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Development includes most building and engineering works, various operations, and material changes in the use of buildings or land. This<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":46,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-61","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/dmresource.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/61","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dmresource.co.uk\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/dmresource.co.uk\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/dmresource.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dmresource.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=61"}],"version-history":[{"count":4,"href":"https:\/\/dmresource.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/61\/revisions"}],"predecessor-version":[{"id":71,"href":"https:\/\/dmresource.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/61\/revisions\/71"}],"up":[{"embeddable":true,"href":"https:\/\/dmresource.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/46"}],"wp:attachment":[{"href":"https:\/\/dmresource.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=61"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}